PROJECT WORK STRUCTURE

Pixel Global & App Reseller

Pre Project Procedure:

  • A client identifies a requirement for a Meet installation that is outside the scope of App reseller.

  • Pixel Global is introduced to client as a specialist AV installer with the skills and experience to deliver Meet installation.

  • Client confirms following to Pixel Projects:

    • Location of installation and contact on site.
    • Brief from client on required functionality.
  • Pixel Global to schedule site survey (physical or remote depending on location and client brief).

    • Pixel Global to prepare proposal for consideration by client.

    Project Handover:

    • Project handover to include

      • Project BOM.
      • Project scope of works.
      • Drawing schematics and room elevations (if applicable).
      • Project timelines.
      • Project contact details – Pixel and Client.
    • Project manager to confirm installation dates with client and book into the Pixel engineering diary.

    Connect with your team from anywhere. With easy-to-join video calls, you can meet face to face without the added cost of travel.